Heavy load of E-Stacks (Power Modules of the wind mill tower) Wind mill project MERKUR (Germany – North Sea).

Marine Warranty Surveyor in Saint Nazaire, for the loading operation and shipping of the E-Stacks built in the GE factory at Montoir.